Careers

Current Postings

Utility Technologist

CLOSING DATE: January 28, 2022

Responsible for the operation, maintenance, integration, and configuration of the SCADA Monitoring Systems throughout AFNWA. Install, maintain, and calibrate instrumentation, radio communication equipment, master meters, pressure control valves, generators, and other associated electronic controls in the system. Perform maintenance to water and wastewater booster stations and fire pumping equipment. Support Operations staff in the operation of various pumping and treatment systems.

APPLICATION INSTRUCTIONS:  Kindly forward all inquiries and applications to HR@AFNWA.CA. Application documents will only be accepted in .PDF or .DOC format. The applicant will receive an email confirming that the application has been received and all attachments are accessible. Successful candidates will be contacted on or before February 7, 2022, for next steps.